SAP Basis Job Management Concept

Direkt zum Seiteninhalt
Job Management Concept
System monitoring and management tools
I recommend that you schedule the background job PFCG_TIME_DEPENDENCY with the report RHAUTUPD_NEW. Scheduling the RHAUTUPD_NEW report with two variants has proven to be a best practice: Once a day before users log on for the first time (e.g. midnight or very early in the morning). This way the users are synchronized once a day. Once a month (or even once a week) with the option "Perform cleanup", so that obsolete profiles and user mappings are regularly cleaned up. Also handy: If the naming conventions of your roles allow it, you can also align the report according to different time zones. For example, I have a customer who runs the user synchronization for his users in the USA and Asia at different times, so that the daily business of the respective users is not disturbed.

Overall, SAP Basis operation requires not only a high-quality technical infrastructure, but also distinct know-how and experience. This is because the management of the underlying SAP NetWeaver and SAP HANA platforms has become extremely complex.
What does SAP Basis Support do?
Part of an IT or cloud strategy may be to define architectural guidelines and a framework for the use and use of certain services. The SAP basis is to actively participate in shaping the rules and framework and the architectural guidelines, and bring in its existing expertise from the SAP technology environment.

The database layer is used to store all company data and consists of the database management system (DBMS) and the data itself. In each NetWeaver system there is a database server on which the SAP database is located. It provides all other applications with the necessary data. The data is not only data tables, but also applications, system control tables and user data. All basic components ensure that the user has fast and reliable access to this data.

"Shortcut for SAP Systems" makes it easier and quicker to complete a number of SAP basis tasks.

Some useful tips about SAP basis can be found on www.sap-corner.de.

If you install SAPCAR version 7.2 or later and have a user with the necessary permissions, all you have to do is insert the Note 2408073 into your system and do the manual pre- and post-processing.

A transport order can contain multiple tasks.
SAP Corner
Zurück zum Seiteninhalt